Large new build house in Hertfordshire - Case study

Luxury New Build Home Construction

Demolition and ground preparation
The original house had to be demolished, leaving just two walls as per architect's instruction. We then prepared the foundations and piling before moving onto the next step.

Wall construction
After completing the foundations and putting in place all the safety measures, we moved onto the construction of the walls. Only the highest quality weatherproof blocks and bricks have been used.

Preparing for the construction
After installing heavy-duty wood and metal roof trusses to ensure that the pitched roof will last for generations, our roofer had laid felt and top quality roof tiles over the trusses.

Fitting the glazing
Next, we fitted the floor to ceiling glazing to the central part of the house as well as sliding glass doors on each side to connect the house with the garden and to allow natural light into the new luxurious family home.
Kitchen Fitting, Plumbing and Electrics
The electrical engineer prepared all the electrical fixes throughout the house to prepare for the fitting of the interiors. We made the kitchen area ready for the bespoke hand made shaker cabinets and the kitchen island to be fitted by Mark Wilkinson. We then sourced bespoke marble kitchen worktops and splashbacks for our clients and laid matching marble floor tiles.

Completion